The Steel-Root foundation serves as foundation for DEGER dual axis tracking systems. With just a flick of the wrist the Steel-Root construction is assembled and can be lowered into a suitable pit. The excavated soil is filled up later and compacted in layers.
No removal of excavated material and no curing time required. The surface is not sealed and the materials can be recycled after the easy dismantling procedure. If necessary, the Steel-Root foundation can be individually adapted to different tracking systems, construction projects and difficult soil conditions.
Advantages:
• Easy to transport, because compactly bundled
• Low technical requirements when assembling (assembly time including excavation and filling up the pit approx. 2-3 hours)
• No curing time needed
• The excavated soil is filled back in afterwards – no removal necessary
• Easy to dismantle
• Reusable materials